Honda Plant Expansion

Timmonsville, SC

An expansion of Honda of SC’s manufacturing plant, this 47,000 SF addition to an existing building contains a 28,000 SF conditioned production area to house a new packing conveying line. The addition also includes a 19,000 SF unconditioned secure storage zone to allow staging of completed vehicles prior to packing for shipment to distributors, and covered and enclosed secure walkway area between the buildings.

Built in partnership with Thompson-Turner Construction as a design/build project, the project uses a Nucor Metal Building as its basis, and the adaptable design will support future expansion as needed. A fast-track project, the building was awarded in August 2017 for design with completion prior the end of January 2018 for scheduled delivery of production equipment.